Category
High Rise Prefabricated Steel Structure House Building Frame Construction Hotel
Product attributes 1.Building type: High rise steel structure 2.Main steel structure type: This main steel structure ado
Basic Info.
Model NO. | DRYC25 |
Connection Form | Bolt Connection |
Member | Steel Column |
Type of Steel For Building Structure | H-Section Steel |
Residential Wall Structure | Wall Support |
Application | Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge |
Transport Package | Naked Packing |
Specification | Customized |
Origin | Qingdao |
HS Code | 73089000 |
Production Capacity | 30, 000 Tons a Year |
Product Description
Model NO. | DRYC Steel Structure Hotel |
Origin | Qingdao, China |
Carbon Structural Steel | Q235/Q355 |
Frame Type | Portal Frame |
Door | Automatic Lifting Door, Rolling Shutter Door, Sliding Door |
Window | Aluminum Alloy, Plastic Steel |
Roof and Wall Panels | Metal Roofing Panel, Profiled Steel Plate, Steel Frame Lightweight Roofing Panels |
Sandwich Panel | EPS, PU, Fiberglass, Rockwool |
Connection Form | Bolt or Welded Connection |
Spray Paint | Anticorrosive Paint, Anticorrosive Paint, Fireproof Paint |
Daylighting Setting | Lighting Belt, Lighting Tube, Fixed Window |
Ventilation | Ridge Ventilator, Turbine Ventilator |
Production Capacity | 2000 Tons Per Month |
Transport Package | Standard Packing |
Trademark | DRYC |
HS Code | 73089000 |
Product attributes
1.Building type:
High rise steel structure
2.Main steel structure type:
This main steel structure adopt box column, round tube, cross items, H steel and ect.
3.Secondary steel structure:
Column bracing, roof bracing, steel truss floor deck, stairs, fencing and ect.
4.Cladding system:
Roof and wall use prefabricated concrete exterior wall.
5.Galvanized standard, paint type and color:
Customize according to actual architectural application requirements and your specific requirements.
Production processAdvanced machine
Project Cases
Company Profile Dingrui Yongcheng Steel Structure Co., Ltd. was established in 2014, integrating the design, manufacture and installation of steel structures. Our factory covers an area of more than 30,000 square meters, with a workshop area of 20,000 square meters. In the factory, there are 6 advanced production lines of H-beam, which can process up to 2,500 tons of new building materials per month. We also have the most advanced new-type building material equipment and intelligent new-type building material processing line in China. This intelligent production line can independently complete a series of processes such as straight strip division, transmission, assembly, welding, flipping, and straightening of steel, and truly realize production automation and mechanization.FAQ
Q1. You are manufacture factory or trading company?We are manufacture factory. And you are welcomed to visit us at any time for inspection. The quality control flow and sales team will show you our professionalism. Also, you will get best and most competitive price after visiting us.Q2. What the quality assurance you provided and how do you control qualityEstablished a procedure to check products at all stages of the manufacturing process-raw materials, in process materials, validated or tested materials, finished goods, etc. SGS, BV and other testing are available for us.Q3. Is your price competitive compared with other companies?Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.Q4. Do you offer designing service for us?Absolutely, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) etc., we can design complex industrial building like office mansion, super market, auto dealer shop, shipping mall, 5 stars hotel. One-stop service is our outstanding superiority with no doubt.Q5. What's your delivery time?Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receiving deposit. Large order delivery time should be arranged separately.Q6.How can I pa for my order?30% down payment by TT,70% balance is paid by TT before shipment.